# Voith Hydro wins order to expand Kruonis pumped storage plant in Lithuania

Voith Hydro won the general contractor order to install a fifth 110 MW variable-speed pump turbine unit at Ignitis Gamyba's Kruonis pumped storage hydropower plant in Lithuania. Ignitis Gamyba is investing around EUR 150 million in the expansion, with operation expected by the end of 2026.

- Type: Contract
- Announced: 2023-05-03
- Where: Kruonis, Lithuania, Lithuania
- Value: $165.0M (150.0M EUR)
- Status: announced
- Capacity: 110 MW pump turbine unit
- Products: pump turbine, motor-generator, full-size converter, transformer, penstock
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Voith Hydro](https://endata.com/companies/10534.md) (supplier)
- [Ignitis Gamyba](https://endata.com/companies/10535.md) (customer)

## Sources

- [energystorageeurope.eu](https://energystorageeurope.eu/news/voith-hydro-wins-order-to-expand-kruonis-pumped-storage-plant-in-lithuania/), 2023-05-03: "Ignitis Gamyba is investing around EUR 150 million in the expansion of the Kruonis pumped storage hydropower facility, where an additional, fifth unit will be installed."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
