# SLG Group breaks ground on AED 200 million integrated hub at Dubai Industrial City

SLG Group started construction on a AED 200 million manufacturing, warehouse, and corporate office facility spanning 1.37 million sq.ft. at Dubai Industrial City. The facility will have an annual production capacity of 90,000 tonnes of milk powder and 10,000 tonnes of butter, and is expected to create 300 new jobs.

- Type: New facility
- Announced: 2024-10-23
- Where: Dubai Industrial City, Dubai, United Arab Emirates
- Value: $54.5M (200.0M AED)
- Jobs: 300
- Starts operating: 2025
- Status: under construction
- Capacity: 90,000 tonnes of milk powder and 10,000 tonnes of butter per year
- Products: milk powder, butter, milk, whey, fruit and vegetable-based seasonings
- Sectors: [Food Processing Equipment](https://endata.com/sectors/food-processing-equipment.md)

## Companies

- [Silver Line Gate Group](https://endata.com/companies/80607.md)
- [TECOM Group](https://endata.com/companies/80608.md) (partner)

## Sources

- [prnewswire.com](https://www.prnewswire.com/news-releases/slg-group-breaks-ground-on-aed-200-million-integrated-hub-at-dubai-industrial-city-to-chart-global-expansion-302284660.html), 2024-10-23: "Silver Line Gate Group (SLG Group) has started construction on its AED 200 million integrated hub at Dubai Industrial City, the Middle East's leading manufacturing and logistics hub."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
