# KJTS subsidiary signs 20-year chiller plant contract with Centel in Pattaya

KJTS's subsidiary KJTN Engineering signed a 20-year agreement with Central Plaza Hotel (Centel) for retrofit works, O&M services, and chilled water supply at Centara Grand Mirage Beach Resort Pattaya. The retrofit works are valued at THB 38.98 million, with total fixed fees of THB 148.82 million over 20 years.

- Type: Contract
- Announced: 2024-09-25
- Where: Pattaya, Thailand, Thailand
- Value: $1.10M (39.0M THB)
- Status: announced
- Products: chiller plant retrofit, operation and maintenance services, chilled water supply
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [KJTS Group Berhad](https://endata.com/companies/79995.md)
- [KJTN Engineering Co., Ltd.](https://endata.com/companies/80061.md)
- [Central Plaza Hotel Public Company Limited](https://endata.com/companies/80062.md) (customer)

## Sources

- [kjts.com.my](https://www.kjts.com.my/kjts-secures-another-20-year-long-term-projects-from-central-group/), 2024-09-25: "KJTS’s subsidiary, KJTN Engineering Co., Ltd. (“KJTN Engineering”) has signed an agreement with Central Plaza Hotel Public Company Limited (“Centel”) for the retrofit works, provision of operation and maintenance services for the chiller plant, and supply of chilled water at Centara Grand Mirage Bea"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
