# GE Power India wins order to supply turbine spares for NTPC Talcher plant

GE Power India Limited has bagged an order from NTPC Limited to supply main turbine spares for the Talcher plant in Odisha, India, valued at INR 1.87 crore, to be fulfilled over 9.5 months.

- Type: Contract
- Announced: 2024-09-16
- Where: Talcher, Odisha, India
- Value: $223K (18.7M INR)
- Status: announced
- Products: main turbine spares
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [NTPC Limited](https://endata.com/companies/883.md) (customer)
- [GE Power India](https://endata.com/companies/3202.md) (supplier)

## Sources

- [projectxindia.com](https://projectxindia.com/2024/09/16/ge-power-india-wins-order-to-supply-main-turbine-spares-for-ntpc%c2%92s-talcher-plant/), 2024-09-16: "GE Power India Limited has bagged an order from NTPC Limited to supply main turbine spares for the Talcher plant in Odisha."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
