# ZIEHL-ABEGG opens EUR 100M fan manufacturing hub in Winston-Salem, North Carolina

ZIEHL-ABEGG celebrated the grand opening of a new production and logistics headquarters in Winston-Salem, North Carolina, with an investment of EUR 100 million. The facility spans 48,500 m² and can produce up to 800,000 fans per year.

- Type: New facility
- Announced: 2024-08-22
- Where: Winston-Salem, North Carolina, United States
- Value: $111.0M (100.0M EUR)
- Starts operating: 22 Aug 2024
- Status: completed
- Capacity: 800,000 fans per year
- Products: bionic fans
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Ziehl-Abegg SE](https://endata.com/companies/376.md)

## Sources

- [fanpost.ziehl-abegg.com](https://fanpost.ziehl-abegg.com/en/detail/new-cutting-edge-manufacturing-hub-opened-in-the-us), 2024-09-11: "We’ve built this facility with the future in mind. It’s designed to be flexible and adaptable, so we can continue to innovate and meet the evolving needs of our customers."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
