# EcoWater to build 15,000 sq ft testing lab in Ripley, Mississippi

EcoWater announced plans to construct a 15,000 square foot testing laboratory as an expansion of its existing facility in Ripley, Mississippi. The facility is expected to be completed by February 2025.

- Type: Expansion
- Announced: 2024-09-11
- Where: Ripley, Mississippi, United States
- Starts operating: Feb 2025
- Status: announced
- Products: water softener parts testing
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [EcoWater](https://endata.com/companies/79746.md)

## Sources

- [djournal.com](https://www.djournal.com/sentinel/news/ecowater-announces-new-expansion-for-ripley-facility/article_9695b260-6f6f-11ef-a6e2-cb3f6439d400.html), 2024-09-11: "We are excited to announce that, due to remarkable growth over the last year, Ripley EcoWater is expanding."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
