# Interarch plans Phase 2 expansion at Andhra Pradesh facility

Interarch Building Products held a groundbreaking ceremony for Phase 2 of its PEB facility in Attivaram, which will add 40,000 MT capacity and 500 jobs, with an investment of INR 57 crores.

- Type: Expansion
- Announced: 2024-09-06
- Where: Attivaram, Nellore, Andhra Pradesh, India
- Value: $6.80M (570.0M INR)
- Jobs: 500
- Starts operating: Apr 2025
- Status: announced
- Capacity: 40,000 MT annually (Phase 2)
- Products: pre-engineered steel structures, metal roofing and cladding systems
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Interarch Building Products](https://endata.com/companies/79661.md)

## Sources

- [aceupdate.com](https://aceupdate.com/interarch-opens-new-peb-manufacturing-facility-in-andhra-pradesh/), 2024-09-06: "Phase 2 would be established using funds from the IPO at a projected cost of 57 crores."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
