# GE Vernova secures order for 16 LM6000VELOX packages for TVA

GE Vernova has secured an order for 16 LM6000VELOX gas turbine packages to be installed at Tennessee Valley Authority's Kingston Energy Complex in Tennessee, USA. The units are expected to enter operation in 2028 and deliver up to 850 MWe.

- Type: Contract
- Announced: 2024-09-04
- Where: Kingston, Tennessee, United States
- Status: announced
- Capacity: 850 MWe
- Products: LM6000VELOX gas turbine packages
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Vernova](https://endata.com/companies/2947.md) (supplier)
- [Tennessee Valley Authority](https://endata.com/companies/7357.md) (customer)

## Sources

- [modernpowersystems.com](https://www.modernpowersystems.com/analysis/ha-in-korea-lm6000velox-for-tva/), 2024-09-04: "GE Vernova has secured an order for no less than 16 of its LM6000VELOX gas turbine packages to be installed at Tennessee Valley Authority's Kingston Energy Complex"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
