# Goldwind opens first overseas wind turbine factory in Camaçari, Bahia

Goldwind inaugurated a new wind turbine factory in Camaçari, Bahia, Brazil, its first manufacturing facility outside China. The plant can produce up to 150 turbines per year and represents an investment of R$ 100 million, expected to create up to 100 direct and 500 indirect jobs.

- Type: New facility
- Announced: 2024-08-27
- Where: Camaçari, Bahia, Brazil
- Value: $18.0M (100.0M BRL)
- Jobs: 600
- Starts operating: 27 Aug 2024
- Status: completed
- Capacity: 150 turbines per year
- Products: wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Goldwind](https://endata.com/companies/58062.md)

## Sources

- [en.clickpetroleoegas.com.br](https://en.clickpetroleoegas.com.br/empresa-chinesa-desembarca-no-brasil-e-inaugura-primeira-fabrica-de-turbinas-eolicas-fora-da-china-iniciativa-pode-gerar-mais-de-500-empregos/), 2024-08-29: "We are happy to launch this unit to meet the growing Brazilian market for clean energy."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
