# FEAL opens new plant in Cerno for solar substructures

FEAL completed a new plant in Cerno near Ljubuški, Bosnia and Herzegovina, for machining profiles and producing pre-assembled aluminum substructures for solar power plants. The investment was 5.5 million EUR.

- Type: New facility
- Announced: 2024-08-28
- Where: Cerno near Ljubuški, Bosnia and Herzegovina, Bosnia & Herzegovina
- Value: $6.05M (5.50M EUR)
- Status: completed
- Products: aluminum substructures for solar power plants
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Feal](https://endata.com/companies/60572.md)

## Sources

- [ekapija.com](https://www.ekapija.com/news/4843158/sirokobrijeski-feal-dvogodisnji-investicioni-ciklus-zavrsava-novom-fabrikom-u-hrvatskoj-u-planu), 2024-08-28: "Isti je namijenjen strojnoj obradi profila i proizvodnji predgotovih aluminijskih potkonstrukcija za solarne elektrane."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
