# MMK to build machine building workshop for heavy engineering equipment

MMK Group's subsidiary Mekhanoremontny Kompleks is investing over RUB 5 billion ($54.42 million) to construct a machine building workshop with a capacity of 10,000 units per year, producing heavy engineering equipment for metallurgical, mining, processing, lifting and transport applications. The workshop is scheduled for start-up in the last quarter of 2025.

- Type: Investment
- Announced: 2024-08-14
- Where: Russia
- Value: $54.4M (5.00B RUB)
- Starts operating: Q4 2025
- Status: under construction
- Capacity: 10,000 units per year
- Products: heavy engineering equipment, metallurgical equipment, mining equipment, processing equipment, lifting equipment, transport equipment
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [MMK](https://endata.com/companies/4688.md)
- [Mekhanoremontny Kompleks](https://endata.com/companies/79191.md)

## Sources

- [steelorbis.com](https://www.steelorbis.com/steel-news/latest-news/russias-mmk-to-begin-production-of-equipment-for-steelmaking-and-mining-1353120.htm), 2024-08-14: "The new workshop, which will have a capacity of 10,000 units per year, will produce heavy engineering equipment, primarily focusing on the production of metallurgical, mining, processing, lifting and transport equipment."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
