# Stellar Energy opens Normandy Campus manufacturing facility in Jacksonville

Stellar Energy opened its second manufacturing facility in Jacksonville, Florida, the Normandy Campus, a 510,433-square-foot facility that will create 250 jobs by end of 2024. The company invested $28 million.

- Type: Expansion
- Announced: 2024-06-24
- Where: Jacksonville, Florida, United States
- Value: $28.0M
- Jobs: 250
- Starts operating: 24 Jun 2024
- Status: completed
- Capacity: triple manufacturing capacity in 2024, fivefold in 2025
- Products: energy systems, turbine inlet air chilling, thermal energy storage, district cooling
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Stellar Energy](https://endata.com/companies/75195.md)

## Sources

- [jaxdailyrecord.com](https://www.jaxdailyrecord.com/news/2024/jun/24/stellar-energy-opens-normandy-campus-in-west-jacksonville/), 2024-06-24: "The power-system manufacturer’s second area manufacturing facility will bring 250 jobs by the end of the year, the company said."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
