# GE Vernova secures order for 3.8GW Saudi power plants

GE Vernova secured an order from Sepco 3 to supply six 7HA.03 and two 7E.03 gas turbines for the Taiba 1 and Qassim 1 IPP projects in Saudi Arabia, with a total combined capacity of 3,800MW. It also signed a 21-year service agreement with Nomac.

- Type: Contract
- Announced: 2024-06-24
- Where: Taiba 1 (near Medina) and Qassim 1 (near Buraydah), Saudi Arabia
- Status: announced
- Capacity: 3,800 MW total
- Products: 7HA.03 gas turbines, 7E.03 gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Vernova](https://endata.com/companies/2947.md) (supplier)
- [National Operations & Maintenance Company (Nomac)](https://endata.com/companies/30608.md) (customer)
- [Sepco 3](https://endata.com/companies/51637.md) (customer)

## Sources

- [meed.com](https://www.meed.com/ge-vernova-signs-38gw-saudi-plant-deal), 2024-06-24: "GE Vernova has secured an order for six 7HA.03 gas turbines and two 7E.03 gas turbines for two upcoming power plants in Saudi Arabia with a total combined capacity of 3,800MW."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
