# HUBER SE opens new assembly and logistics hall P4 in Berching

HUBER SE put the new 5,500 m² assembly and logistics hall P4 into operation at its headquarters in Berching, Germany, housing assembly, logistics and dispatch of disc filters, pile cloth media filters and belt dryers. The production area grew from approx. 31,000 m² to approx. 44,000 m².

- Type: Expansion
- Announced: 2024-06-20
- Where: Berching, Germany
- Starts operating: 20 Jun 2024
- Status: completed
- Capacity: 5,500 m² hall
- Products: HUBER Disc Filter RoDisc, HUBER Pile Cloth Media Filter RotaFilt, HUBER Belt Dryer BT
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [HUBER SE](https://endata.com/companies/9110.md)

## Sources

- [huber-se.com](https://www.huber-se.com/press/news/detail/huber-se-puts-new-assembly-and-logistics-hall-p4-into-operation-headquarter-berching/), 2024-06-21: "HUBER SE has put the new assembly and logistics hall P4 into operation at its headquarters in Berching."
- [huber-se.com](https://www.huber-se.com/en-us/press/news/detail/huber-se-puts-new-assembly-and-logistics-hall-p4-into-operation-headquarter-berching/), 2024-06-21: "HUBER SE has put the new assembly and logistics hall P4 into operation at its headquarters in Berching."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
