# Fetra starts expansion of production and logistics in Germany

Fetra – Fechtel Transportgeräte GmbH has begun construction to expand production and logistic areas, including a 9,252 m² production hall, an automatic pallet warehouse, and a dispatch hall, with completion expected by April 2025.

- Type: Expansion
- Announced: 2024-06-20
- Where: Borgholzhausen, North Rhine-Westphalia, Germany
- Starts operating: 25 Apr 2025
- Status: under construction
- Capacity: 9,252 sq m production and storage hall, 1,680 sq m dispatch hall, 4,136 pallet spaces
- Products: transport equipment made of steel, aluminium and stainless steel
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [Fetra – Fechtel Transportgeräte GmbH](https://endata.com/companies/78151.md)
- [viastore](https://endata.com/companies/8030.md) (supplier)

## Sources

- [fetra.com](https://www.fetra.com/news/erweiterung-produktion-und-logistik), 2024-06-20: "Construction measures have begun on 20th May 2024 and shall be completed until 25th April 2025"
- [warehouse-logistics.com](https://www.warehouse-logistics.com/en/news/ypxilu7rmvtp2p6n14tcprlb), 2024-07-17: "The company has now launched a comprehensive construction project to expand its production and logistics facilities."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
