# ELSIB to supply two turbogenerators to Novosibirsk CHP-3

NPO ELSIB will supply two TVF-130-2UHL4 turbogenerators (130 MW each) to Novosibirsk CHP-3 under the DPM-2 program. The first unit will be delivered in 2024, the second in 2025, replacing units that have operated for over 50 years.

- Type: Contract
- Announced: 2024-06-18
- Where: Novosibirsk, Russia
- Status: announced
- Capacity: 130 MW per unit
- Products: turbogenerators TVF-130-2UHL4
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [ELSIB](https://endata.com/companies/34349.md) (supplier)
- [Novosibirsk CHP-3](https://endata.com/companies/78108.md) (customer)

## Sources

- [energy-press.ru](https://energy-press.ru/energyefficiency/elsib-postavit-dva-turbogeneratora-na-novosibirskuyu-tec-3.html), 2024-06-18: "Первая машина в данный момент находится в производстве и будет поставлена на энергоблок № 13 в 2024 году."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
