# Endeavour Mining starts wet commissioning at Lafigué gold project

Endeavour Mining announced that wet commissioning activities are underway at the Lafigué gold project in Côte d'Ivoire, with construction 94% complete and first gold pour expected in late June 2024.

- Type: Expansion
- Announced: 2024-06-07
- Where: Lafigué, Côte d'Ivoire, Côte d’Ivoire
- Starts operating: Jun 2024
- Status: under construction
- Products: gold
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [Endeavour Mining](https://endata.com/companies/21465.md)

## Sources

- [miningconnection.com](https://miningconnection.com/coal_prep/p30/P2800), 2024-06-07: "Endeavour Mining said wet commissioning activities are now underway at the Lafigué Project in Côte d’Ivoire."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
