# Tsementum plans capacity expansion at Saratov cement plant

Tsementum plans to increase cement production capacity by 271,000 tonnes per year at an existing plant in Saratov Oblast, with an investment of 3.5 billion rubles, to be completed by October 2027.

- Type: Expansion
- Announced: 2024-06-06
- Where: Saratov Oblast, Russia
- Value: $38.5M (3.50B RUB)
- Starts operating: Oct 2027
- Status: announced
- Capacity: 271,000 tonnes per year
- Products: cement
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Tsementum](https://endata.com/companies/70879.md)

## Sources

- [news.sarbc.ru](http://news.sarbc.ru/main/2024/06/06/297960.html), 2024-06-06: "Проект по наращиванию мощностей с объемом инвестиций в 3,5 млрд руб., максимальным дополнительным объемом цемента 271 тыс. т. в год."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
