# Water treatment system plant to be built in Solnechnogorsk, Moscow Oblast

An investor will build a water treatment system production plant in Solnechnogorsk, Moscow Oblast, with an investment of 2 billion rubles. The first phase is expected to launch by the end of 2025, and full capacity by 2026, creating 200 jobs.

- Type: New facility
- Announced: 2024-06-06
- Where: Solnechnogorsk, Moscow Oblast, Russia
- Value: $22.0M (2.00B RUB)
- Jobs: 200
- Starts operating: 2025
- Status: under construction
- Products: water treatment systems
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies


## Sources

- [globalmsk.ru](https://globalmsk.ru/news/id/70967), 2024-06-05: "В конце следующего года будет запущена первая очередь."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
