# CIP orders 125 wind turbines from GE Vernova for Teruel wind farm

Copenhagen Infrastructure Partners signed a €700 million agreement with GE Vernova to supply 125 wind turbines for the Teruel wind farm in Spain, with a total capacity of 760 MW. The deal includes a 15-year full-service contract.

- Type: Contract
- Announced: 2024-05-28
- Where: Teruel, Spain, Spain
- Value: $760.0M (700.0M EUR)
- Status: announced
- Capacity: 760 MW
- Products: wind turbines, wind turbine blades
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Vernova](https://endata.com/companies/2947.md) (supplier)
- [Copenhagen Infrastructure Partners](https://endata.com/companies/10167.md) (customer)

## Sources

- [diariodecadiz.es](https://www.diariodecadiz.es/empresas-al-dia/Copenhagen-Infrastructure-Partners-Vernova-Teruel_0_1906911009.html), 2024-05-28: "Este acuerdo refuerza cómo podemos utilizar nuestra estrategia de productos workhorse para proporcionar a nuestros clientes tecnología probada que les permita construir flotas de alta calidad y alto rendimiento a escala."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
