# Tosyali Algérie starts up flat steel plant in Bethioua, Algeria

Tosyali Algérie announced the commissioning of its flat steel production plant in Bethioua, Oran, Algeria. The first phase started in May 2024, with full operation expected in the second half of 2024. The investment is between $120 million and $150 million.

- Type: New facility
- Announced: 2024-05-27
- Where: Bethioua, Oran, Algeria
- Value: $135.0M
- Starts operating: May 2024
- Status: completed
- Capacity: 3 million tonnes of steel per year (first phase)
- Products: flat steel, hot-rolled steel, cold-rolled steel, galvanized steel
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Tosyali Algérie](https://endata.com/companies/48097.md)

## Sources

- [algerie-eco.com](https://algerie-eco.com/2024/05/27/tosyali-algerie-annonce-la-mise-en-service-de-son-usine-de-production-dacier-plat/), 2024-05-27: "Tosyali Algérie a l'immense honneur d'annoncer la mise en service de son usine de production d'acier plat en mai 2024."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
