# Airedale by Modine acquires new production site in Bradford for data centre cooling

Airedale by Modine acquired a 14.6-acre site in Bradford, UK, to expand manufacturing of data centre cooling systems. The site will add 29,000 sq m of space and is expected to become operational in December 2024, creating over 200 jobs.

- Type: Expansion
- Announced: 2024-05-10
- Where: Bradford, England, United Kingdom
- Jobs: 200
- Starts operating: Dec 2024
- Status: announced
- Capacity: 150% increase in production output for data centre products
- Products: precision air conditioning equipment, air handlers, fan walls, data centre cooling systems
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Airedale by Modine](https://endata.com/companies/44681.md)

## Sources

- [racplus.com](https://www.racplus.com/news/airedale-by-modine-acquires-new-uk-production-site-10-05-2024/), 2024-05-10: "Airedale by Modine will be expanding its manufacturing capabilities for IT cooling systems with the acquisition of a new 14.6 acre production site in England."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
