# Sarens wins contract for module transport and installation at Jafurah Gas Plant

Sarens has been contracted by Samsung Saudi Arabia to transport and install 34 modules (total 18,535 tons) and transport and lift 108 heavy items (total 12,283 tons) for the Jafurah Gas Plant Project in Saudi Arabia.

- Type: Contract
- Announced: 2024-05-07
- Where: Jafurah Gas Field, Saudi Arabia
- Status: announced
- Products: heavy lifting and transport services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Sarens](https://endata.com/companies/371.md)
- [Samsung Saudi Arabia](https://endata.com/companies/77265.md) (customer)

## Sources

- [oilandgasmiddleeast.com](https://www.oilandgasmiddleeast.com/news/jafurah-gas-plant-project-sarens-to-transport-and-install-34-modules), 2024-05-07: "Sarens has secured a contract for the transportation and installation of 34 modules, totalling 18,535 tons in weight, as well as the transportation and lifting of 108 heavy items."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
