# BMW Group starts construction of high-voltage battery assembly in San Luis Potosí

BMW Group began construction of a high-voltage battery assembly facility at its San Luis Potosí plant in Mexico, investing €800 million in the site expansion. The facility will support production of the Neue Klasse from 2027.

- Type: Expansion
- Announced: 2024-05-03
- Where: San Luis Potosí, Mexico
- Value: $864.0M (800.0M EUR)
- Starts operating: 2027
- Status: under construction
- Products: high-voltage batteries
- Sectors: [Automotive Components](https://endata.com/sectors/automotive-components.md)

## Companies

- [BMW](https://endata.com/companies/13009.md)

## Sources

- [newsroom.bmwgroup.com](https://newsroom.bmwgroup.com/emea/nl-be/de-bouw-van-de-hoogspanningsaccu-assemblage-gaat-van-start-in-de-bmw-group-plant-san-luis-potosi), 2024-05-03: "Construction of a local high-voltage battery assembly has now begun, along with expansion projects for the body shop, assembly and logistics areas."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
