# Elcogen builds new factory in Tallinn to expand SOFC/SOEC capacity to 360 MW

Elcogen is constructing a new 14,000 m2 factory in Tallinn's Loovälja Industrial Park to expand manufacturing capacity for solid oxide fuel cells and electrolyser cells from 10 MW to 360 MW. Construction started in January 2024, with operations scheduled to begin mid-2025.

- Type: Expansion
- Announced: 2024-05-03
- Where: Tallinn, Loovälja Industrial Park, Estonia
- Starts operating: Jul 2025
- Status: under construction
- Capacity: 360 MW
- Products: solid oxide fuel cells (SOFC), solid oxide electrolyser cells (SOEC), stacks
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Elcogen](https://endata.com/companies/37547.md)

## Sources

- [elcogen.com](https://elcogen.com/elcogens-new-production-facility-to-expand-manufacturing-capacity-to-360-mw/), 2024-05-03: "Elcogen is pleased to announce the development of a new factory in Tallinn that will substantially expand the Company’s solid oxide fuel cell and stack and solid oxide electrolyser cell and stack manufacturing capacity."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
