# ArcelorMittal expands Vega do Sul plant capacity with new CRC line

ArcelorMittal is investing BRL 1.9 billion ($370.37 million) to build a new line for cold-rolled and coated products at the Vega do Sul plant in Santa Catarina, increasing capacity from 1.6 million to 2.2 million mt per year.

- Type: Expansion
- Announced: 2024-05-03
- Where: Vega do Sul, Santa Catarina, Brazil
- Value: $370.4M
- Status: announced
- Capacity: 2.2 million mt per year CRC and coated products
- Products: cold-rolled and coated steel products
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [ArcelorMittal](https://endata.com/companies/292.md)

## Sources

- [steelorbis.com](https://www.steelorbis.com/steel-news/latest-news/arcelormittal-maintains-expansion-plans-in-brazil-1338520.htm), 2024-05-03: "In the southern state of Santa Catarina, the Vega do Sul plant is receiving BRL 1.9 billion ($370.37 million) for the set-up of a new line to produce CRC and coated products, increasing Vega’s capacity from 1.6 million mt to 2.2 million mt per year."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
