# SSAB to build $4.9B fossil-free steel mini-mill in Luleå, Sweden

SSAB announced a decision to build a fossil-free mini-mill in Luleå, Sweden, with a capacity of 2.5 million tonnes of carbon emission-free steel annually. Total investment is estimated at €4.5 billion ($4.9 billion). Startup is planned at the end of 2028 with full capacity one year later.

- Type: New facility
- Announced: 2024-04-10
- Where: Luleå, Sweden
- Value: $4.90B (4.50B EUR)
- Starts operating: 2028
- Status: announced
- Capacity: 2.5 million tonnes per year
- Products: fossil-free steel
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [SSAB](https://endata.com/companies/1465.md)

## Sources

- [esgtoday.com](https://www.esgtoday.com/ssabs-new-5-billion-in-fossil-free-steel-mill-to-eliminate-7-of-swedens-co2-emissions/), 2024-04-10: "The transformation of Luleå is a major step on our journey to fossil-free steel production."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
