# Vertiv opens new manufacturing facility in Pelzer, South Carolina

Vertiv announced a major expansion of its North American manufacturing operations with a new 215,000 sq ft facility in Pelzer, South Carolina, creating up to 300 jobs and producing integrated modular solutions for data centers.

- Type: Expansion
- Announced: 2024-03-10
- Where: Pelzer, South Carolina, United States
- Jobs: 300
- Starts operating: 3 Oct 2024
- Status: completed
- Capacity: 215,000 square feet
- Products: integrated modular solutions, modular power systems, IT infrastructure solutions
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Vertiv](https://endata.com/companies/14494.md)

## Sources

- [prod.vertiv.cn](https://prod.vertiv.cn/en-emea/about/news-and-insights/news-releases/vertiv-expands-north-american-production-capacity-with-new-infrastructure-solutions-manufacturing-facility/), 2024-03-10: "The Vertiv Pelzer facility adds 215,000 square feet of manufacturing space and is projected to create up to 300 additional skilled job opportunities at this location."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
