# 3C Metal Belmet wins order from De Beers Marine for crawler steelwork

3C Metal Belmet South Africa was commissioned by De Beers Marine to fabricate the main frame structural steelwork for two next-generation crawlers for Debmarine Namibia's diamond recovery vessel MV Benguela Gem. The work involves about 200 tons of fabrication.

- Type: Contract
- Announced: 2024-03-06
- Where: Cape Town Harbour, South Africa, South Africa
- Status: announced
- Products: main frame structural steelwork for crawlers, crawler track and main frames
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md), [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [Debmarine Namibia](https://endata.com/companies/6749.md) (customer)
- [De Beers Marine](https://endata.com/companies/40486.md) (customer)
- [3C Metal Belmet South Africa](https://endata.com/companies/76114.md) (supplier)

## Sources

- [metalworkingnews.info](https://metalworkingnews.info/3c-metal-belmet-south-africa-wins-order-to-fabricate-main-frame-structural-steelwork-for-de-beers-marines-generation-crawlers/), 2024-03-06: "3C Metal Belmet says it is very pleased to be once again carrying out important work for the MV Benguela Gem."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
