# HORN to supply glass melting furnace for Ambev plant in Brazil

HORN Glass Industries will supply a sustainable glass melting furnace for Ambev's new container glass plant in Carambei, Paraná, Brazil, with a capacity of 400 tonnes per day.

- Type: Contract
- Announced: 2024-03-05
- Where: Carambei, Paraná, Brazil
- Status: under construction
- Capacity: 400 tonnes per day
- Products: glass bottles, glass melting furnace
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [AmBev](https://endata.com/companies/9593.md) (customer)
- [HORN Glass Industries](https://endata.com/companies/9626.md) (supplier)

## Sources

- [glassonline.com](https://www.glassonline.com/horn-builds-sustainable-glass-melting-furnace-for-ambev/), 2024-03-05: "HORN will be responsible for the supply of the container glass furnace, all refractory materials, steel construction, E-fusion power boosting, auxiliary equipment, supervision, manpower for construction and tools for installation and commissioning."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
