# ABB wins order for shore connection solution at Portsmouth International Port

ABB won an order from Portsmouth International Port to supply a shore connection system for ferries and cruise ships as part of the Sea Change project. The system is due for installation in Q4 2024 and operational by Q2 2025.

- Type: Contract
- Announced: 2024-02-29
- Where: Portsmouth, United Kingdom
- Status: announced
- Products: shore connection system
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [ABB](https://endata.com/companies/1547.md) (supplier)
- [Portsmouth International Port](https://endata.com/companies/11582.md) (customer)

## Sources

- [gcaptain.com](https://gcaptain.com/abb-to-supply-shore-connection-solution-to-portsmouth-international-port/), 2024-02-29: "ABB has won an order with Portsmouth International Port to supply a shore connection solution for visiting ferries and cruise ships."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
