# ABB to supply shore power solution for Portsmouth International Port

ABB was appointed primary contractor for the Sea Change shore power project at Portsmouth International Port, covering three berths. The system is due for installation in Q4 2024 and operational by Q2 2025.

- Type: Contract
- Announced: 2024-02-28
- Where: Portsmouth, England, United Kingdom
- Status: announced
- Products: shore power connection system
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [ABB](https://endata.com/companies/1547.md) (supplier)
- [Portsmouth International Port](https://endata.com/companies/11582.md) (customer)

## Sources

- [latecruisenews.com](https://latecruisenews.com/2024/02/28/abb-to-supply-shore-power-solution-for-portsmouth-international-port-cruise-britain/), 2024-02-28: "ABB is appointed primary contractor as part of Portsmouth International Port’s Sea Change project."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
