# Jimmy to build nuclear generator assembly plant in Le Creusot, France

Jimmy will invest €100 million to build a nuclear thermal generator assembly plant in Le Creusot, France, with construction starting September 2024 and final commissioning in 2028, creating 300 jobs.

- Type: New facility
- Announced: 2024-02-15
- Where: Le Creusot, Saône-et-Loire, France
- Value: $108.0M (100.0M EUR)
- Jobs: 300
- Starts operating: 2028
- Status: announced
- Products: nuclear thermal generators
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Jimmy](https://endata.com/companies/75671.md)

## Sources

- [energies.newstank.fr](https://energies.newstank.fr/article/view/315336/jimmy-construction-usine-assemblage-creusot-saone-loire-partir-septembre.html), 2024-02-15: "100 M€, tel sera l'investissement réalisé par Jimmy dans sa future usine de construction et d'assemblage de générateurs thermiques nucléaires située au Creusot (Saône-et-Loire)."
- [aer-bfc.com](https://aer-bfc.com/en/paris-based-start-up-jimmy-has-chosen-le-creusot-as-the-location-for-its-future-nuclear-thermal-generator-construction-and-assembly-plant-in-burgundy-franche-comte/), 2024-03-11: "With an investment of 100 million euros, Jimmy aims to mass-produce cutting-edge nuclear generators, intended to revolutionize the energy sector."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
