# Mitsubishi Power receives order for Navoi 3 GTCC power plant in Uzbekistan

Mitsubishi Power received an order from JSC Thermal Power Plants for a 600 MW gas turbine combined cycle (GTCC) power plant at the Navoi Power Plant in Uzbekistan. The plant will use a M701JAC gas turbine and is scheduled to start commercial operation in 2026.

- Type: Contract
- Announced: 2024-02-13
- Where: Navoi, Uzbekistan
- Status: announced
- Capacity: 600 MW electric power, 200 Gcal/h heat
- Products: gas turbine combined cycle power plant, M701JAC gas turbine
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Power](https://endata.com/companies/7073.md) (supplier)
- [JSC Thermal Power Plants](https://endata.com/companies/75629.md) (customer)

## Sources

- [power.mhi.com](https://power.mhi.com/news/240213.html), 2024-02-13: "Mitsubishi Power, a power solutions brand of Mitsubishi Heavy Industries, Ltd. (MHI), has received an order for one system of core equipment for a high-efficiency power generation facility, including a state-of-the-art M701JAC (J-series Air-Cooled) gas turbine, for the third facility planned to be b"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
