# Airbus to build second A320 final assembly line in Tianjin

Airbus is preparing a second final assembly line for the A320 Family at its Tianjin facility (FALA), with operations scheduled to commence by the end of 2025. The layout design is finalized and preparations are underway.

- Type: Expansion
- Announced: 2024-02-03
- Where: Tianjin, China
- Starts operating: 2025
- Status: under construction
- Products: A320 family aircraft
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [Airbus](https://endata.com/companies/1653.md)

## Sources

- [english.news.cn](https://english.news.cn/20240203/0dcbc24e6d3147b09d0f5b621defc747/c.html), 2024-02-03: "The line is scheduled to commence operations by the end of 2025."
- [global.chinadaily.com.cn](http://global.chinadaily.com.cn/a/202402/04/WS65bee836a3104efcbdae9881.html), 2024-02-04: "The line is scheduled to commence operations by the end of 2025."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
