# Prom Tekhnologii 4.0 to build water treatment equipment plant in Dubna, Russia

Prom Tekhnologii 4.0 will build a production complex in the Dubna Special Economic Zone to manufacture water treatment and purification equipment. The investment is 350 million rubles, creating over 50 jobs, with launch planned for 2024.

- Type: New facility
- Announced: 2024-01-23
- Where: Dubna, Moscow Oblast, Russia
- Jobs: 50
- Starts operating: 2024
- Status: announced
- Products: water treatment and purification equipment
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Prom Tekhnologii 4.0](https://endata.com/companies/75192.md)

## Sources

- [mosregtoday.ru](https://mosregtoday.ru/news/soc/sistemy-ochistki-i-podgotovki-vody-nachnut-proizvodit-na-territorii-oez-dubna/), 2024-01-23: "Объем инвестиций в проект составляет порядка 350 миллионов рублей."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
