# Midea starts construction of €60 million heat pump plant at Clivet in Feltre, Italy

Midea Group began construction of a heat pump production and R&D base at Clivet's site in Feltre, Veneto, with a €60 million investment. The base is expected to start operating in the second quarter of 2024.

- Type: New facility
- Announced: 2022-10-14
- Where: Feltre, Veneto, Italy
- Value: $58.8M (60.0M EUR)
- Status: under construction
- Capacity: 100,000 external and 200,000 internal heat pump units annually
- Products: heat pumps, air-to-water heat pumps
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Midea](https://endata.com/companies/1678.md)
- [Clivet](https://endata.com/companies/9799.md) (partner)

## Sources

- [chinadaily.com.cn](http://www.chinadaily.com.cn/a/202210/15/WS634a007ba310fd2b29e7c96a.html), 2022-10-15: "The new base, which is designed to include an annual capacity of 100,000 external and 200,000 internal heat pump units, is expected to be put into operation in the second quarter of 2024."
- [coolingpost.com](https://www.coolingpost.com/world-news/midea-confirms-e60m-clivet-heat-pump-factory/), 2022-10-16: "Midea has confirmed the start of construction of a new €60m air-to-water heat pump production base with the laying of a foundation stone at its Clivet factory in Feltre, Italy."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
