# FLSmidth wins DKK 380 million order for comminution equipment for copper concentrator in South America

FLSmidth received an order valued at approximately DKK 380 million to supply two ball mills and three high-pressure grinding rolls for a greenfield copper concentrator owned by a major copper miner in South America. The equipment is expected to be delivered in 2025.

- Type: Contract
- Announced: 2024-01-09
- Where: South America
- Value: $55.0M (380.0M DKK)
- Status: announced
- Products: ball mills, high pressure grinding rolls (HPGR)
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [FLSmidth](https://endata.com/companies/4673.md)

## Sources

- [australianmining.com.au](https://www.australianmining.com.au/flsmidth-locks-in-south-american-deal/), 2024-01-09: "FLSmidth is set to supply comminution technologies for a greenfield concentrator owned by a major copper miner in South America"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
