# Babcock Wanson Group to build new plant in Nérac, France

The Babcock Wanson Group announced the building of a new 80,000 m² plant in Nérac, France, to increase production capacity for decarbonised process heating solutions. The first phase is scheduled for completion by end of 2026.

- Type: New facility
- Announced: 2024-01-03
- Where: Nérac, France, France
- Starts operating: 2026
- Status: announced
- Capacity: 80,000 m²
- Products: industrial process heating equipment, electric and electrode boilers, oxy-combustion boilers, hydrogen-designed boilers
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Babcock Wanson](https://endata.com/companies/25110.md)

## Sources

- [engineering-update.co.uk](https://engineering-update.co.uk/2024/01/03/significant-new-babcock-wanson-group-factory-to-lead-the-field-in-decarbonised-process-heating/), 2024-01-03: "The Babcock Wanson Group ... has announced the building of a substantial new plant in Nérac, France."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
