# Vaillant Group starts heat pump production at new Senica plant

Vaillant Group began series production of heat pumps at its new plant in Senica, Slovakia, in September 2023, with an annual capacity of 300,000 units and a total investment of over €120 million.

- Type: New facility
- Announced: 2023-09-01
- Where: Senica, Slovakia
- Value: $130.8M (120.0M EUR)
- Starts operating: Sep 2023
- Status: completed
- Capacity: 300,000 heat pumps per year
- Products: heat pumps
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Vaillant](https://endata.com/companies/10230.md)

## Sources

- [teraz.sk](https://www.teraz.sk/import/vaillant-group-o-dalsom-rozsirovani/763614-clanok.html), 2023-12-25: "Prvé vonkajšie jednotky tepelných čerpadiel boli následne otestované v Nemecku. Pozitívne výsledky umožnili spustenie sériovej výroby na prvej linke v septembri tohto roka."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
