# Murata Machinery to build new building for semiconductor transport system production in Ise, Mie

Murata Machinery will invest 3.6 billion yen to construct a new building at its Ise, Mie factory to increase production capacity for semiconductor wafer transport systems to 2.5 times that of 2020. The building is expected to be completed in April 2025.

- Type: Expansion
- Announced: 2023-12-12
- Where: Ise, Mie Prefecture, Japan
- Value: $25.0M (3.60B JPY)
- Starts operating: Apr 2025
- Status: announced
- Capacity: 2.5 times production capacity compared to 2020
- Products: semiconductor wafer transport systems
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md), [Material Handling](https://endata.com/sectors/material-handling.md)

## Companies

- [Murata Machinery](https://endata.com/companies/16691.md)

## Sources

- [nikkei.com](https://www.nikkei.com/article/DGXZQOUF1217X0S3A211C2000000/), 2023-12-12: "村田機械は半導体工場向けの搬送システムを増産する。36億円を投じて三重県伊勢市の工場に新棟を建設し、2025年4月に完成させる。"
- [nikkei.com](https://www.nikkei.com/article/DGKKZO76900120T11C23A2TB1000/), 2023-12-12: "村田機械は半導体工場向けの搬送システムを増産する。36億円を投じて三重県伊勢市の工場に新棟を建設し、..."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
