# Horiba Stec to build new production plant in Fukuchiyama, Kyoto

Horiba Stec will construct a new factory in Fukuchiyama, Kyoto Prefecture, with an investment of approximately 17 billion yen. Construction is scheduled to start in July 2024 and be completed in January 2026.

- Type: New facility
- Announced: 2023-12-12
- Where: Fukuchiyama, Kyoto Prefecture, Japan
- Value: $119.0M (17.0B JPY)
- Starts operating: Jan 2026
- Status: announced
- Capacity: MFC production capacity up to 3 times current level
- Products: mass flow controllers, chemical concentration monitors, printed circuit boards
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [HORIBA STEC](https://endata.com/companies/32969.md)

## Sources

- [atpress.ne.jp](https://www.atpress.ne.jp/news/378928), 2023-12-12: "HORIBAグループ過去最大の投資(約170億円)を通じて、最新設備により自動化・効率化を促進する量産技術の基幹工場として、幅広い用途に応用できる広大な生産エリアを備えます。"
- [horiba.com](https://www.horiba.com/jpn/company/news/detail/news/12/2023/20231212-fukuchiyama/), 2023-12-12: "HORIBAグループ過去最大の投資（約170億円）を通じて、最新設備により自動化・効率化を促進する量産技術の基幹工場として、幅広い用途に応用できる広大な生産エリアを備えます。"
- [medicalbuyer.co.in](https://medicalbuyer.co.in/horiba-stec-to-build-new-factory-in-fukuchiyama-kyoto/), 2023-12-26: "Built with the HORIBA Group’s largest ever investment (approx. 17 billion yen), it will act as the core factory for mass-production technologies."
- [horiba.com](https://www.horiba.com/int/company/news/detail/news/12/2023/20231226-stec/), 2023-12-26: "Built with the HORIBA Group’s largest ever investment (approx. 17 billion yen), it will act as the core factory for mass-production technologies."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
