# FIPL and GE sign 25-year gas turbine maintenance deal

First Independent Power Limited (FIPL) signed a long-term contract with General Electric (GE) for the maintenance of its GT13E2 Gas Turbine at the FIPL Afam Power Plant until 2031.

- Type: Contract
- Announced: 2023-11-23
- Where: Afam Power Plant, Nigeria
- Status: completed
- Products: gas turbine maintenance services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [General Electric](https://endata.com/companies/1262.md) (supplier)
- [First Independent Power Limited](https://endata.com/companies/73973.md) (customer)

## Sources

- [independent.ng](https://independent.ng/fipl-general-electric-ink-25-year-gas-turbine-maintenance-deal/), 2023-11-23: "This alliance with GE not only strengthens our commitment to providing reliable power solutions but also reaffirms our dedication to embracing cutting-edge technologies and industry best practices."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
