# Adler launches 'Factory of the Future' expansion and modernisation project

Paint manufacturer Adler Lacke launched the 'Factory of the Future' project to expand and modernise its production in Schwaz, Austria, starting with converting a high-bay warehouse into a fully automated raw materials logistics system. The new raw materials logistics system is scheduled to be commissioned in stages from mid-2025.

- Type: Expansion
- Announced: 2023-11-23
- Where: Schwaz, Austria
- Starts operating: Q3 2025
- Status: under construction
- Products: water-based coatings
- Sectors: [Specialty Chemicals](https://endata.com/sectors/specialty-chemicals.md)

## Companies

- [Adler Lacke](https://endata.com/companies/73970.md)

## Sources

- [european-coatings.com](https://www.european-coatings.com/news/markets-companies/adler-launches-expansion-and-modernisation-project/), 2023-11-23: "With the 'Factory of the Future', we will further strengthen our location and create high-quality, future-proof jobs."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
