# HII awarded $130M Navy contract for LHA 10 long lead materials

HII received a potential $130 million contract from the U.S. Navy to provide long lead time materials and engineering support for the America-class amphibious assault ship LHA 10. Work will occur in multiple locations through July 2028.

- Type: Contract
- Announced: 2023-11-17
- Where: Beloit, Wisconsin; Pascagoula, Mississippi; Brunswick, Georgia; Walpole, Massachusetts, United States
- Value: $130.0M
- Status: announced
- Products: long lead time materials for amphibious assault ship
- Sectors: [Automotive Components](https://endata.com/sectors/automotive-components.md)

## Companies

- [HII](https://endata.com/companies/39223.md)
- [U.S. Navy](https://endata.com/companies/4174.md) (customer)

## Sources

- [govconwire.com](https://www.govconwire.com/articles/hii-secures-130m-navy-contract-for-lha-10-ship-long-lead-time-material-procurement), 2023-11-17: "HII has received a potential $130 million contract to provide long lead time materials and related engineering and design support for the U.S. Navy’s America-class amphibious assault ship Flight 1 LHA 10."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
