# Mott MacDonald Bentley secures AMP8 framework with South West Water

Mott MacDonald Bentley (MMB) secured a multi-million-pound AMP8 framework contract with South West Water, running until 2028 with a possible five-year extension. MMB will deliver water non-infrastructure schemes at clean water treatment works in the west of the region.

- Type: Contract
- Announced: 2023-11-14
- Where: South West England (Cornwall, Devon, Isles of Scilly, parts of Dorset and Somerset), United Kingdom
- Status: completed
- Products: water treatment works design and construction
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [South West Water](https://endata.com/companies/8185.md) (customer)
- [Mott MacDonald Bentley](https://endata.com/companies/21127.md) (supplier)

## Sources

- [mottmacbentley.co.uk](https://www.mottmacbentley.co.uk/post/mott-macdonald-bentley-secures-amp8-framework-with-south-west-water), 2023-11-15: "Mott MacDonald Bentley (MMB) has secured its first ever framework with South West Water."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
