# BHEL secures order for equipment supply to Adani Power's 2x800 MW project

BHEL has secured an order from Mahan Energen Limited (Adani Power subsidiary) to supply boiler, turbine, and generator for a 2x800 MW supercritical power project in Bandhaura, Madhya Pradesh. The order is valued at approximately Rs. 4,000 crore ($480 million).

- Type: Contract
- Announced: 2023-11-11
- Where: Bandhaura, Madhya Pradesh, India
- Value: $480.0M (40.0B INR)
- Status: announced
- Capacity: 1600 MW (2x800 MW)
- Products: boiler, turbine, generator, supercritical power equipment
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Bharat Heavy Electricals](https://endata.com/companies/1451.md)
- [Adani Power](https://endata.com/companies/15513.md) (partner)
- [Mahan Energen](https://endata.com/companies/72152.md) (customer)

## Sources

- [projectxindia.com](https://projectxindia.com/2023/11/11/bhel-secures-order-for-supplying-equipment-to-adani-powers-2x800-mw-project-in-madhya-pradesh/), 2023-11-11: "BHEL has secured an order from Mahan Energen Limited, a subsidiary of Adani Power Limited, to supply equipment including Boiler, Turbine, and Generator."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
