# Factorial Energy opens solid-state battery manufacturing facility in Massachusetts

Factorial Energy opened a new battery manufacturing facility in Methuen, Massachusetts, representing a $50 million investment. The facility will house a 200MWh solid-state battery assembly line and is expected to create over 150 jobs.

- Type: New facility
- Announced: 2023-10-23
- Where: Methuen, Massachusetts, United States
- Value: $50.0M
- Jobs: 150
- Starts operating: 23 Oct 2023
- Status: completed
- Capacity: 200 MWh
- Products: solid-state batteries for EVs
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Factorial Inc.](https://endata.com/companies/73181.md)

## Sources

- [businesswire.com](https://www.businesswire.com/news/home/20231023929129/en/Factorial-Energy-Opens-New-Manufacturing-Facility-to-House-Largest-Solid-State-Battery-Line-in-the-US), 2023-10-23: "We are thrilled to open our next-generation battery facility in Massachusetts as we scale our batteries for mass production."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
