# Eastey relocates production to larger 50,000 sq ft building in Big Lake, Minnesota

Eastey, a shrink-packaging equipment maker owned by Engage Technologies, moved its sealer and tunnel manufacturing into a 50,000 sq ft building in Big Lake, Minnesota, announced June 1, 2022.

- Type: New facility
- Announced: 2022-06-01
- Where: Big Lake, Minnesota, United States
- Status: completed
- Capacity: over 42,000 sq ft of production space
- Products: shrink-packaging equipment, sealers, tunnels, automated case erectors
- Sectors: [Packaging](https://endata.com/sectors/packaging.md), [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Eastey](https://endata.com/companies/9546.md)
- [Engage Technologies Corporation](https://endata.com/companies/9547.md)

## Sources

- [canadianpackaging.com](https://www.canadianpackaging.com/general/eastey-relocates-production-operations-to-a-new-facility-in-big-lake-minnesota-172332/), 2022-08-02: "The building will be the new home for Eastey sealer and tunnel production operation, including metal fabrication, welding, paint, assembly, product testing, and more."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
