# Alliander signs framework agreement with TKF for 50 kV cable supply

Alliander, parent company of Qirion, signed a multi-year framework agreement with Twentsche Kabelfabriek (TKF) for the supply and installation of 50 kV cable systems for Liander's grid expansion projects. The first cables were successfully tested on September 20, 2023.

- Type: Contract
- Announced: 2023-10-10
- Where: Netherlands
- Status: announced
- Products: 50 kV cable systems
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Twentsche Kabelfabriek](https://endata.com/companies/67494.md) (supplier)
- [Alliander](https://endata.com/companies/73134.md) (customer)

## Sources

- [qirion.nl](https://qirion.nl/alliander-gaat-partnerschap-aan-met-nieuwe-kabelleverancier/), 2023-10-10: "Door deze overeenkomst wordt de doorlooptijd van leveringen korter, waardoor projecten die bijdragen aan de energietransitie sneller kunnen beginnen."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
